The story of the street
Klaratunneln is a road tunnel in central Stockholm with two branches. The shorter one, about 500 metres long, runs between Tegelbacken and Sveavägen, and the longer, about 850 metres, from Tegelbacken to Mäster Samuelsgatan. The tunnel passes beneath Sergels torg, Brunkebergstorg and the blocks Wahrenberg and Elefanten.
The background is the long dispute over how Sveavägen should be extended southwards, a question that occupied politicians, architects and traffic experts from the 1920s. In the city plan of 1946 the city council decided that Sveavägen should end at Sergels torg and the traffic be led into a tunnel towards Tegelbacken. The plan was developed in City 62, which added a branch to the east, and altered somewhat in city plan 67. The tunnel belonged to the Norrmalmsregleringen and was among the last traffic projects of that redevelopment.
The project was publicly debated in the autumn and winter of 1959 to 1960. The Chamber of Commerce and the Högerpartiet (today the Moderaterna) were critical, while the Social Democrats and the Folkpartiet supported the tunnel. Because the loose gravel and sand of the Brunkeberg ridge required it, the tunnel was dug in an open cut. Meanwhile opinion turned against the city redevelopments, with the Almstriden of 1971 generally regarded as the turning point. Together with weaker public finances this led to the eastern branch ending abruptly at Mäster Samuelsgatan instead of continuing on bridges towards Östermalm. The stretch between Tegelbacken and Sveavägen opened in October 1976 and the eastern branch in June 1979, both without special ceremonies.
In February 2020 the municipal council decided that the tunnel was to be renovated. According to a report from 2024 the work is provisionally planned for 2028 to 2030.
Good to know
- The tunnel's ceiling is only 3 metres high, so it has no traffic cameras or fans in the roof.