History
Tensta water tower, also called Tenstareservoaren, stands on the highest point of Tensta in the northern part of the district, right beside the E18 and surrounded by apartment blocks. The tower was built in 1969 and holds 18,000 cubic metres of drinking water, pumped here from the Lovö waterworks. The highest water level is 66.10 metres above sea level. The drawings came from Vattenbyggnadsbyrån (VBB), which also designed Sätra vattentorn in southern Stockholm, built at the same time.
Tensta grew up on the Järva field, which the military had used as a training ground since 1907. In 1962 the government decided to release almost all of the field for housing, and in 1967 the first residents began to move in. Tensta was built in the 1960s as part of the Million Programme, like its neighbours Rinkeby and Hjulsta. The tower comes from the same era. It expresses a 1960s ideal of deliberately placing taller buildings on the highest ground, like large-scale sculptures in the cityscape.
The design is austere. The tower is a massive concrete body carried on two rows of broad concrete pillars, and the only ornament on the facade is pairs of concrete pilasters. The rest of the concrete is untreated and shows the marks of the formwork boards. The massive volume, the sturdy pillars and the rhythmically placed pilasters make it recall an enlarged ancient round temple. Mobile phone antennas are also mounted on the tower.
Around the tower are grassy slopes, steep towards the north and the motorway, a gravel yard with a small technical shed and tall pines on the western side. A footpath leads up from the south. The tower is visible from Tensta, from the E18 and from the Järva field. The Stockholm City Museum has classified it green, meaning it is judged especially valuable in historical, cultural, environmental or artistic terms.
Stockholm Vatten och Avfall is running a project to extend and renovate the tower. It is now close to 60 years old and has to grow larger to secure the water supply, mainly in Västerort. In autumn 2026 groundwork is under way ahead of the extension. According to the company, the work is planned to run from 2026 to 2034, with the extension first and the renovation of the older tower afterwards.
