Essingebron

Three parallel bridges of 1965 to 1967 across Essingedjupet, between Lilla and Stora Essingen.

History

Two of them carry the Essingeleden motorway, and the third is a local bridge. All were built between 1965 and 1967 and took the place of an older bridge right next to them.

The first link between the islands, in 1917, was a temporary pontoon footbridge with a hand-pulled ferry across the shipping opening. In 1921 a bascule bridge replaced the ferry. The Stockholm harbour board began planning a permanent bridge that same year, and in 1927 the city council decided to build it. Sixteen firms bid on a proposal from the harbour board's construction office, and the architect Erik Lallerstedt reviewed the aesthetics of the eight that remained after screening. The lowest bid came from Bergsunds Mekaniska Verkstad, with Christiani & Nielsen as subcontractor, and Paul Hedqvist designed the bridge. The bid first covered a steel arch in three spans. At Lallerstedt's request it became five spans of equal size, 40 metres each. With the viaducts over the islands the bridge was 339 metres long. It was built with room for rail traffic but carried only trolleybuses, and it opened in November 1928. It cost 620,000 kronor, not counting the access roads.

When Essingeleden was planned, the old bridge stood in the way and was torn down in the mid 1960s. The local bridge opened on 10 May 1965, just southeast of the old bridge. It measures 470 metres between the abutments and 200 metres over the water, and its longest span is 100 metres. Since 1983 the local bridge and its approach road as far as Essinge brogata on Lilla Essingen have been called Gamla Essinge broväg. The motorway bridge opened in two steps: the eastern pair on 21 August 1966, designed by AOS Arkitekter with Gekonsult as engineer, and the third span on 3 September 1967, during the switch to right-hand traffic. The bridge deck has three spans of 56, 100 and 56 metres, and before opening the bridge was load tested with thirty lorries loaded with gravel. According to Vägverket, about 150,000 vehicles a day crossed it in 2007.

On Friday 14 October 2005 the pontoon crane Lodbrok, on its way to Hornsberg, struck the northbound motorway bridge. Its crane arm, lowered to 23.5 metres, hit the edge beam and the box wall. The motorway was closed at once and northbound traffic was sent over Västerbron and Slussen. The southbound lanes reopened the same day at 15:34, and full capacity returned on 29 December 2005. Final checks and repairs in 2006 were completed on 6 August. No one was injured. In summer 2010 the Swedish Transport Administration announced that a laser system with warning lights would be installed.