History
The media gave the building its name, as there was no official one. With the “Leitprojekt Donaukanal” the city wanted to upgrade the bank and invited Zaha Hadid to contribute. She showed her project in an exhibition until January 1995; at first five tilted and twisting volumes were planned.
Otto Wagner’s Stadtbahn is no longer in service at this spot because of a changed route, but its arches are listed. A new development plan of 1996 provided for three volumes above them with owner-occupied and subsidised rental flats; shops, studios and restaurants were meant to move in below. What was built were three volumes with flats let for fixed terms. Construction ran from 2004 to 2005, at a cost of nearly ten million euros, two million of them paid by the City of Vienna.
Success did not follow: tenants moved out, no operators were found for the premises, and in 2006 the developer went bankrupt. On 31 October 2007 the last lease ran out. It has remained a striking building all the same, especially seen from the Danube Canal cycle path.
