History
Since 2025 a loading crane on the quay wall at Handelskai in Leopoldstadt has been a listed monument. In the view of the Federal Monuments Office it is all that is left of the loading facilities of the Vienna river port, and it probably dates from the early 20th century. The office also calls it an example of this kind of technical installation in Austria.
The river port came into being on the right bank of the Danube after the Danube regulation was completed in 1875. The open landing stage was about twelve kilometres long and gave ships no shelter from floods or ice drift. It was connected to the hinterland by the Danube bank railway and Handelskai, which left the landing area a narrow strip about 75 metres wide. Because the First Danube Steamship Company had almost a monopoly at the time, the landing stage presumably belonged largely to it. Foreign companies also had berths with sheds, storehouses and loading equipment. Handelskai was officially named in 1884, after the warehouses on the Danube bank.
