History
The Steinitzsteg was first called Nordsteg. It crosses the Danube and the Neue Donau downstream of the Nordbrücke and links Brigittenau with Floridsdorf. The Viennese architect Johann Georg Gsteu designed the 875 metre bridge, which was finished in 1995.
As early as 1996 it had a very different job: during the general renovation of the Nordbrücke, two lanes of traffic at a time were diverted over it. In 1997 the footbridge was cleaned and prepared for pedestrians and cyclists. Before that the Nordbrücke had only two narrow pavements and no cycle link across the Danube here. If needed it can be fitted out for cars again with little effort, and it is meant to serve as a detour route during the next renovation of the Nordbrücke.
On the 110th anniversary of his death, in summer 2010, an explanatory plaque was fixed to it.
It is built in several sections: reinforced concrete bridges over the Handelskai, the Donauuferbahn and the Donauinsel, and between them a 411 metre steel box girder over the Danube.