History
The Pfaffenaubrücke lies on the Ostautobahn and is managed by ASFINAG. The class I road bridge is of reinforced concrete, 70 metres long and 38 metres wide, and was built in 1978. That makes it almost twice as wide as the nearby Haidebrücke.
Nearby lies the Simmering environmental centre. The Pfaffenau waste incineration plant, officially opened in September 2008, is designed for around 250,000 tonnes of residual waste a year from the south-eastern districts and turns it into electricity and district heating. Biogas Wien began operating in 2007 and processes 22,000 tonnes of organic waste a year. Both plants share one building, which lies between the Donaukanal and Johann-Petrak-Gasse. For its design a project company announced a competition in early 2003, in which 33 firms took part. Erwin and Herbert Resetarits together with Sne Veselinovic won it. The facade is orange, echoing the vehicles and uniforms of the waste collection service. In 2013 MA 48 opened the Pfaffenau waste logistics centre.
