History
It joins Kagran and Kaisermühlen, and the Alte Donau underground station lies at its south-western end.
Towards the end of the Second World War the bridge of the time was blown up. The new one, which passed its load test on 14 November 1945, was built from what was at hand: steel plates stored at the works dictated the design, a grillage girder bridge with eight welded plate girders. The surface was a ten centimetre wood block paving. Waagner Biro began the welding on 7 August 1945, and Porr did the masonry work.
For the widening of Wagramer Straße it was made wider in the 1970s without stopping traffic. The upstream half was built first, then the second, and the only closure came in one night when the gap between the two was filled with concrete. Its present form opened on 7 October 1977, with the old span of 31.9 metres and a width of 22.5 metres.