Strolly

Penzing

Hallenbad Hütteldorf

Municipal indoor pool on Linzer Straße, formerly run privately as Waldbad Penzing.

History

On Linzer Straße stands a swimming pool of the City of Vienna that long ran under another name. It was built between May 1994 and 1997 and cost 266 million schillings, equivalent to 19.3 million euros. A fire during construction delayed completion. In 1998 it was leased to the private "Tropicana Bäderbetrieb und Freizeitanlagen" for an annual rent of one schilling and was called Waldbad Penzing. It replaced the two municipal baths near the Wien river, the Baumgartner Bad and the Hütteldorfer Bad.

After a fire the pool reopened in March 2005 following a year's closure. Because of financial problems it closed on 17 June 2008, and a citizens' initiative collected about 2,000 signatures for its reopening. The City of Vienna took the pool over and rebuilt it for about 3.7 million euros: instead of the wave pool came a 25-metre sports pool, plus an outdoor pool, a modern energy concept, a new roof and a new water slide. On 17 December 2009 the MA 44 reopened it as Hallenbad Hütteldorf.

On 26 April 2008 the first underwater football match between Austria and Germany took place here, before about 800 spectators, with a press conference under water.

Go and see it.

Strolly fills in every street you walk and tells you along the way what happened at the places of the city.

Open in the app
Download on the App Store Get it on Google Play