History
The expansion of the Neu-Gersthof cottage colony made it necessary to carry the higher Bastiengasse over Scheibenbergstraße. On 29 July 1909 the city council approved the construction; following the municipal building office’s plan, a rammed-concrete vault was foreseen. Work began on 2 December 1909.
The loamy sandy soil proved unsuitable. On the suggestion of the building office the project was changed to a reinforced-concrete construction in Monier style. The detailed design by Franz von Krauß and Josef Tölk provided a cast-stone facing, carried out by the firm Rella & Neefe.
The load test took place on 2 November 1910, and the following day the bridge opened without any ceremony. After age damage and a weight limit it was repaired in 1977. The name refers to the field name Dürwaring.
