History
The Science Tower stands on Waagner-Biro-Straße in the district of Lend, north-west of the main station and just north of the Helmut-List-Halle, on part of the former Waagner-Biro site. It is the centrepiece of the district “My Smart City Graz”, which lies partly on the former works site. The office tower is 60 metres tall with 13 floors, the highest storey at 45 metres. Its gross floor area exceeds 2,700 square metres. The design is by the architect Markus Pernthaler.
The concept was created in 2011 by the physicist Mario J. Müller and Pernthaler, conceived as a competence centre and show house for the development and demonstration of sustainable urban technologies. Ground was broken on 5 May 2015, the topping-out followed in June 2016, and the building opened on 21 September 2017 in the presence of infrastructure minister Jörg Leichtfried. The construction cost was 16 million euros, of which 1.144 million came from the Klima- und Energiefonds together with the federal ministry for transport and innovation.
The most striking feature is the double-skin facade around a body shaped like an inverted truncated cone. The inner shell is a metal post-and-rail construction up to the second floor, above it prefabricated element facades with built-in summer night cooling. The outer skin is made of energy glass in the top third and of curved, chemically toughened thin glass in the lower two thirds. Between the third and twelfth floors a shading system in the cavity follows the sun all the way round, carrying a photovoltaic system of 40 kilowatt peak.
The windows set into the larch wood facade can be closed with perforated wooden doors that serve as sun and heat protection. The energy glass works with the Grätzel cell, a dye-sensitised solar cell that needs no silicon and turns sunlight into electricity with an organic dye. A classic high-temperature heating system is absent: twelve borehole heat exchangers, each 200 metres deep, a heat pump and the 200 cubic metre sprinkler water basin as a heat buffer regulate the building, and a bypass allows free cooling in summer without the heat pump.
Companies and institutions from environmental technology work in the building, with tenants including Joanneum Research, Graz University of Technology and the Graz branch of the European Space Agency ESA. In April 2019 a 300 square metre roof garden for urban farming opened on the roof, tended by Joanneum Research.
