History
In the south of Graz, in the district of Puntigam, trains, trams and buses meet in one place. Here the Koralmbahn branches off from the Südbahn, and the station serves as a junction station of the ÖBB. The interchange plays an important role in the transport development concept of the city region.
Puntigam has been linked by tram line 5 since the early days of the Graz tramway. Until February 2006 the line from Andritz ended in front of the Puntigamer Brauhaus. In 2006 the ÖBB station was moved about 450 metres to the north to make changing easier, and line 5 was extended by about 350 metres to a point west of the new stop.
Between 2008 and 2010 the interchange between suburban rail, buses and tram line 5 was improved under the project name “Nahverkehrsknoten Puntigam”. The tram route was shifted east towards the Brauhaus and lowered, and it now passes under the Triester Straße and under the Südbahn and Koralmbahn. The old turning loop was demolished, and the sunken stop Brauhaus lies in its place. The new tram terminus is at the station, and a large covered bus station was added. A possible extension to the Center West was already taken into account. Up to 7,000 additional passengers were expected for 2010. The stop was made barrier free.
The interchange was planned mainly for function, but architecture also mattered. Its look is shaped by a membrane roof: ten parallel steel arches, set slightly offset to follow the passenger islands, form the supporting structure. Membranes of coated glass-fibre fabric are stretched between the arches, and strip-shaped glass skylights sit along the arches. At night the white underside is lit. Drainage basins and green areas are landscaped, and the modelled embankments form green earth pyramids.
