Strolly

Mitte

Moltkebrücke

Red sandstone bridge over the Spree, completed in 1891 and named after Helmuth von Moltke.

History

The Moltke Bridge crosses the Spree and connects Alt-Moabit on the north bank, near the main railway station, with Willy-Brandt-Straße and the Chancellery on the south bank. Construction began in 1888 and ended in 1891. Otto Stahn and Karl Bernhard are named as its architects. The bridge is about 78 metres long and a listed monument today.

It is named after Field Marshal Helmuth von Moltke the Elder (1800 to 1891), who was chief of staff of the Prussian Army for thirty years. Moltke died just before it was finished, and his funeral cortege inaugurated the bridge. It has three crossed arches of red Main sandstone and carries statues by Johannes Boese, Carl Piper and Carl Begas.

In April 1945, during the Battle of Berlin, the bridge saw heavy fighting. German defenders barricaded both ends and prepared it for demolition. On 28 April units of the Soviet 3rd Shock Army attacked the bridge. The demolition charges damaged it and one section fell into the Spree, but enough stood for men and vehicles to cross. From there they moved on the Reichstag, only 600 metres away. The bridge was one of the few to survive the war, looks similar to the original construction and was strengthened for modern traffic.

Sources

Go and see it.

Strolly fills in every street you walk and tells you along the way what happened at the places of the city.

Open in the app
Download on the App Store Get it on Google Play